RED STAG TIMBER manufacturing case studies
PROJECT: Red Stag CLT Pressure Treatment Plant
IMAGE CREDIT: Red Stag Timber
Red Stag has completed or is in the process of completing, seven large timber buildings as part of Red Stag’s manufacturing site. Key building metrics, design, and images have been outlined in a number of downloadable case studies below.
They include:
Red Stag CLT Factory
Red Stag Mobile Plant Workshop
Red Stag Pressure Treatment Plant
Red Stag Reman Building
Red Stag Sawmill Building
Red Stag Stacker Building
Red Stag Trimline Building
In addition:
The case study of the recently completed New Zealand Post Depot has also been included.
New Zealand Post Depot
SPA Point Taupo | Constructed
This building development is part of a new light commercial development on land near the AC Baths in Taupo.
Red Stag Timber – CLT Factory Building
Waipa State Mill Road, Rotorua | Constructed
This building is one of the only CLT manufacturing facilities in New Zealand and will enable the local supply of CLT timber in this country.
Red Stag Timber – Mobile Plant Workshop
Waipa State Mill Road, Rotorua | Constructed
This is the workshop and store for mobile plant. The unique aspect of this building will be the use of CLT columns and beams for the portal structure.
Red Stag Timber – Pressure Treatment Plant 2 Building
Waipa State Mill Road, Rotorua | Under Construction
This $6.7 million building will be part of the Red Stag Timber operation.
Red Stag Timber – Reman Building
Waipa State Mill Road, Rotorua | Constructed
Red Stag’s Remanufacturing building converts timber that does not make ‘structural’ grade into high-value engineered timber for products such door cores and windows. The building is 111m by 45m clear span.
Red Stag Timber – Sawmill Building
Waipa State Mill Road, Rotorua | Constructed
The mill is now the largest in the Southern Hemisphere, milling over 1 million tonnes of logs annually and producing in excess of 600,000m³ of timber. It can process a log every five seconds at maximum pace.
Red Stag Timber – Stacker Building
Waipa State Mill Road, Rotorua | Constructed
The stacker building automatically stacks timber, 80% of which is filleted to be kiln-dried. Notably, this is the first building that used columns and beams ripped from CLT panels.
Red Stag Timber – Trimline Building
Waipa State Mill Road, Rotorua | Under Construction
The trimline and bins are the back end of the sawmill. This is the second building to leverage CLT columns and beams as this is a cost-effective construction technique. Using CLT in place of LVL and Glulam brings capacity to the NZ mass timber market.